Industrial and Occupational Safety

  • Roche Diagnostics GmbH: external HSE consultant, design phase, for the construction of a new 6-storey laboratory building, Penzberg, Germany
  • Roche Diagnostics GmbH: external HSE consultant, design phase, for the refurbishment and expension of a vaccines production, Mannheim, Germany
  • GSK Vaccines GmbH: external HSE consultant, design, construction and commissioning phase, for a new vaccines production building, Marburg, Germany
  • Roche Diagnostics GmbH: external HSE consultant, design, construction and commissioning phase, for the refurbishment and expension of a vaccines production, Penzberg, Germany
  • Andritz Hydro GmbH: preparation of the HSE documents for the infrastructure project at Nkula, Malawi
  • Andritz Hydro GmbH: HSE Consultant for the construction of the New Assiut Barrage Hydropower Plant at Assiut, Egypt
  • Energji Ashta p.k.: preparation of the H&S documents for the 48-MW hydro power plant Ashta near Shkoder, Albania
  • Andritz Hydro GmbH Austria: HSE Consultant for the construction of the Kaunertal Hydro Power Plant penstock system, Prutz, Austria
  • Siemens AG Germany: Execution of a HAZID-Study for the 1.600-MW gas and steam power plan Shuweihat S3 at Abu Dhabi
  • Verbund Renewable Power GmbH: preparation of the health&safety plan and safety relevant documents for the 200-MW windpark, Casimcea, Romania
  • ARGE HABAU/Streicher: Safety engineer for the construction of a gas-pipeline (600mm and 900mm) in Austria and Germany
  • Siemens AG Austria: design safety coordinator for the 400-MW gas and steam power plant HEMWEG at Amsterdam, Netherlands
  • Siemens AG Germany: design safety coordinator for the 400-MW gas and steam power plant DIEMEN at Amsterdam, Netherlands
  • Verbund Hydro Power AG: HSE Consultant for the construction of a 48-MW Hydro-Power-Plant Ashta near Shkoder, Albania
  • Siemens Power Generation Anlagentechnik GmbH: HSE-coordinator for the 400-MW gas and steam power plant Timelkam, Austria (subcontractor)
  • Siemens Power Generation Anlagentechnik GmbH: preparation of VEXAT-documentation for the construction phase and start-up phase of the 400-MW gas and steam power plant Timelkam, Austria
  • City of Linz: creation of the health&safety plan for the renaturation of the collection channels in Urfahr, Austria
  • City of Lenzing: creation of the health&safety plan and site safety coordinator for the infrastructure project of a new housing area, Lenzing, Austria
  • Stecco: storing of ground water-harming material, Aurachkirchen, Austria (subcontractor)
  • Petrofer Chemie GmbH: Caclulation of fire water retention for a petrochemical storage building, Attnang-Puchheim, Austria
  • Brandstetter, joinery: development of fire prevention plan, St Marien, Austria (subcontractor)

Water Management and Land Management

  • Municipality Buchkirchen/ Raika Buchkirchen: drinking water supply to the housing development of Eiselsbergstraße, Municipality of Buchkirchen
  • Real Treuhand Immobilien GmbH: parking lot drainage for the retail centre Schwanenstadt
  • AREV-Immobilien: surface drainage at the Centre Prinz Eugen, Linz
  • ARAL Austria: drinking water well and protected area for a Marchtrenk petrol station
  • Reiter family: small wastewater treatment plant, St. Thomas am Blasenstein
  • Megaplex Cinema: hydraulic calculations for groundwater preservation, Pasching
  • Richter Pharma AG:
  • industrial sewage treatment for a pharma company, Wels
  • Aquarium Linden:
  • industrial sewage treatment for the needs of the aquarium, Steinerkirchen
  • PPI Plastic Products Innovation GmbH&CoKG: cooling water extraction and percolation, Ebensee (subcontract)
  • Raiffeisenbank: canal overhaul, Buchkirchen
  • Jandl Transport GmbH: district construction project, Buchkirchen
  • Spar-Markt: geothermal probe for a heat pump, Eberschwang
  • Dierneder family: exploration of variants for wastewater discharge, Windhaag
  • City of Wels: construction supervision for a wastewater collector, Wels
  • ÖBB (Austrial Railway): culverting of a rail embarkment with a wastewater collector, Bad Goisern (subcontract)
  • Water Cooperative Mayrhof-Reith: drinking water supply, Rutzenmoos (subcontract)
  • Kreuzmayr GmbH: indirect discharger report and surface drainage for a petrol station, Eferding
  • HeinischTextilveredelungGmbH&CoKG: indirect discharger report for a dye factory, Hörsching (subcontract)
  • Horizont 3000: restoration of the water supply and wastewater disposal, St. Mary’s Hospital Lacor, Gulu, Uganda
  • Antunovic family: certificate of surface drainage for a building parcel, Wels

Procedures with Authorities

Please bear in mind that the references under this section can only be presented anonymously to protect our customers.

  • Preparation of submission documents for a permit and obtaining a permit under the water act for the drainage of a housing development after the authority previously gave a negative evaluation for the project under another planner
  • Obtaining a water permit under the water act for the discharge of industrial wastewater after the authority previously gave a negative evaluation for a project drafted by the applicant himself
  • Providing support for a power plant operator in response to the demand of the authority for improving the plant to comply with the state of the art by means of residual water discharge (subcontract)
  • Obtaining approval under the water act for the reissue of a number of expired water permits for well systems
  • Obtaining water permits under the water act for a drinking water well, in spite of the fact that the demands by the authority as a well protection area cannot be met
  • Certificate of tidewater safety for a single-family home. Obtaining permits under building and water act in spite of an appeal filed by neighbours
  • Subsequently obtaining permits under industrial and building law for a producing enterprise with more than 100 employees
  • Industrial plant permits for several locksmiths
  • Industrial plant permit for a logistics centre
  • Industrial plant permit for a warehouse
  • Storage room in compliance with the VbF (Ordinance on flammable fluids) and documents in accordance with VEXAT (Ordinance on explosive atmosphere) for the industrial plant permit for a business (subcontract)
  • Reviews according to Sec. 82b GewO (Industrial Code) for different enterprises (e.g. restaurants, locksmiths, glazier's shops, carpenters shops, stove builders, warehouses and shoe producers)
  • Reviews according to Sec. 134 WRG (Water Act) for various plants (e.g. cavity percolation and well systems)
  • Industrial plant permit for a powder-coating plant
  • Industrial Code permit for a restaurant
  • Industrial Code permit for a garden centre

Durch die weitere Nutzung der Seite stimmen Sie der Verwendung von Cookies zu. Weitere Informationen

Wir verwenden auf unserer Seite keine Cookies. Auf die Cookie Einstellung von verlinkten Seiten haben wir keinen Einfluss. Wenn Sie auf "Akzeptieren" klicken, erklären Sie sich damit einverstanden.

Schließen